Millie Master
Forum Member
I need to change the orange flexible gas pipe in 'Millie' as it has reached/passed the date that is printed on the tube.
So what should I use, some more of the orange stuff that more than likely will have been in stock for some time, eating into the time interval change date printed on the pipe, or could I use heavy duty reinforced polythene pipe, or some of the black stuff that the likes of Gasit sell?
What are your thoughts please?
Phil
So what should I use, some more of the orange stuff that more than likely will have been in stock for some time, eating into the time interval change date printed on the pipe, or could I use heavy duty reinforced polythene pipe, or some of the black stuff that the likes of Gasit sell?
What are your thoughts please?
Phil